Airport Hardstands Repair
Bigger jets required to park closer to the airport terminal require the existing hardstands to be remodeled in order to handle the extra weight. Existing asphalt usually cannot handle the weight of the heavier aircraft.
Rapid Set® concrete was produced on-site by the George L. Throop Company at each of the airports listed below. Different contractors were used to remove the exisitng asphalt and/or concrete and to prepare the area for Rapid Set concrete placement. After the Rapid Set was placed, contractors performed the placing, finishing and curing. The hardstands were returned to service within a few hours of placement because of the quick-setting properties of Rapid Set cement. We completed each of our airport repair projects on time.
NOTE:
Airport Hardstands were replaced at the following airports where the Throop Company worked as a consultant under a general contractor:
- Bob Hope Airport - BUR - Burbank, California
- San Francisco International Airport - SFO – San Francisco, California
- Ontario International Airport - ONT – Ontario, California
- Seattle-Tacoma International Airport – SEA – Seattle, Washington
- Hartsfield-Jackson Atlanta International Airport – ATL – Atlanta, Georgia